O
Denton
← Denton

Denton · issues

Civic issues

Topics getting the most attention in Denton public meetings, ranked by how frequently they come up.

14 issues (filtered)30 topics
HighWater Utilities

Denton Municipal Electric Infrastructure Scrap and Capital Improvements

Denton Municipal Electric is planning to secure a multi-million dollar contract for refurbished transformers and disposal services to maintain local power reliability. This agreement ensures the utility has ongoing access to essential equipment amid supply chain demands.

1 mention (1 this month)Last discussed Oct 19, 2026
CriticalWater Utilities

Clear Creek Interceptor Engineering Expansion

The city authorized eminent domain to acquire necessary land easements to build a $90 million wastewater interceptor project to support growing northern development.

3 mentions (1 this month)Last discussed Oct 13, 2026
HighWater Utilities

Utility Locating and Marking Services Contract ($10.5M)

The city is renewing its contract with USIC Locating Services for $10.5 million over five years to mark underground water, sewer, electric, and fiber lines before any digging occurs. This service is crucial for preventing dangerous and costly utility strikes during construction.

1 mention (1 this month)Last discussed Oct 5, 2026
MediumWater Utilities

Baker Offsite Sewer Project Change Order

Black Rock Construction's contract for the Baker Offsite Sewer Project on Masch Branch Road is getting a change order.

Last discussed Oct 5, 2026
HighWater Utilities

Landfill Disposal Fee Agreements and Tonnage Contracts

The city is entering into a solid waste disposal contract with Frontier Texas Ventures for guaranteed tonnage at the landfill in exchange for a discount disposal fee.

Last discussed Sep 28, 2026
CriticalWater Utilities

Preliminary Utility Budgets and Proposed Rate Adjustments for FY 2026-27

The city reviewed preliminary utility budgets for solid waste, water, wastewater, drainage, and electricity, proposing 3% rate hikes for water and electric and 9% for wastewater to keep up with growth and maintain fund balances.

1 mentionLast discussed Jul 21, 2026
CriticalWater Utilities

Texas Water Development Board Grant Application for AMI Project

Denton Water Utilities is replacing approximately 46,000 water meters with smart meters over a two-year period, backed by a 10-year, $26 million contract with Badger Meter, Inc.

2 mentionsLast discussed Jul 13, 2026
CriticalWater Utilities

Clear Creek Water Reclamation Plant Design

The city is investing $45.5 million in engineering a new wastewater treatment plant to handle rapid growth north of Loop 288.

2 mentionsLast discussed Jun 16, 2026
HighWater Utilities

Commercial Electric Utility Billing and Back-Billing Policy

Public comments raised concerns about high utility deposit requirements and transparency under municipal credit rules. Staff clarified that federal red-flag identity checks apply to new accounts, while internal credit grades govern existing customer deposit adjustments.

3 mentionsLast discussed May 18, 2026
CriticalWater Utilities

Cityworks Asset Management Licenses for Water Utilities

Denton is moving forward with a $26 million, two-year project to replace standard water meters with advanced cellular smart meters. This upgrade will give customers real-time usage data, alert them to leaks, and eliminate the need for manual meter reading.

2 mentionsLast discussed Apr 21, 2026
HighWater Utilities

Water and Wastewater Real-Time Analytics System

The city is investing $6.49 million in a monitoring and analytics platform from Xylem Vue to track water flow and sewer issues in real time. This helps staff catch sewer overflows and pipe bottlenecks before they become major problems.

1 mentionLast discussed Apr 13, 2026
CriticalWater Utilities

Denton Energy Center Turbocharger Maintenance Contract

The Public Utilities Board reviewed an accelerated maintenance schedule for the Denton Energy Center's 24 turbochargers to prevent catastrophic engine failures. The board recommended a $9.52 million five-year contract with Accelleron US Inc., funded partly through winter storm settlement cash and partly through 10-year bonds.

3 mentionsLast discussed Mar 24, 2026
HighWater Utilities

Cross Connection Control and Backflow Ordinance Updates

The city is updating its backflow prevention ordinance to align with state rules and modern industry practices, requiring backflow assemblies on new commercial and multi-family developments while banning un-testable atmospheric vacuum breakers.

1 mentionLast discussed Feb 9, 2026
HighWater Utilities

Robson West Lift Station Engineering Services

The board approved a $2.5 million engineering contract for the Robson West Lift Station after asking questions about how engineering firms are selected from the city's pre-qualified roster.

1 mentionLast discussed Jan 12, 2026